Skip to main content

Overview

Resources in Flashquotes represent your physical business assets - from core service equipment to transportation vehicles. Proper resource management ensures accurate availability tracking and efficient event delivery.

Resource Types

Essential business resources:
  • Coffee carts
  • Mobile bars
  • Service trailers
  • Primary equipment
At least one core resource must be added to enable proper availability tracking on booking forms.
Vehicles used for event logistics:
  • Vans
  • Trucks
  • Trailers
  • Delivery vehicles
Specialized equipment tracking:
  • Espresso machines
  • Grinders
  • Service equipment
  • Specialized tools

Resource Management

To add a new resource:
  1. Click Add Resource in the top right
  2. Enter resource details:
    • Name (e.g., “Cart One”, “White Cart”)
    • Type selection
    • Location assignment
    • Availability status
Consider using themed names for resources to make them memorable and distinctive.
Configure client-facing information:
  • Space requirements
  • Power needs
  • Event type suitability
  • Special features
  • Setup requirements
Upload photos to:
  • Help clients make selections
  • Provide visual reference
  • Enhance booking form experience
  • Document equipment condition

Availability Management

Monitor resource status:
  • Current availability
  • Future bookings
  • Maintenance periods
  • Location tracking
Track resource scheduling:
  • Event assignments
  • Blocked dates
  • Service windows
  • Travel time

Resource Assignment

Manage resource allocation:
  • Event matching
  • Location optimization
  • Equipment pairing
  • Load balancing
Track resource locations:
  • Storage locations
  • Event venues
  • Transit status
  • Return scheduling

Best Practices

  1. Add core resources immediately
  2. Keep availability current
  3. Update resource photos regularly
  4. Monitor resource utilization with the Service Asset Utilization report
  5. Track maintenance needs
  6. Use reports to forecast busy periods and optimize resource allocation

Next Steps

After setting up resources:
I